About Stake Energy

We finance the
hardest part of the
energy transition.

Australia's commercial and industrial sites know battery storage makes economic sense — but capex, operational risk and market complexity stop the rollout. We remove all three.

Manifesto

Batteries are the single biggest unlock for a cheaper, cleaner grid — and the one piece of infrastructure that still expects its owner to fund it, operate it, and gamble on a volatile wholesale market.

Stake Energy was built to change that. We take the capital, the installation, the market risk and the 24/7 operational burden. You get a lower power bill, real Scope 2 reductions, and a cleaner P&L.

Our bet is simple: most C&I sites in Australia should have a battery. Very few have the time, expertise or appetite to build one. We run that play on their behalf — at scale.

Values

How we operate.

— 01

Numbers first, then narrative.

Every pitch we send is built from real interval data and real market simulation. If the numbers don't land, we walk.

— 02

Infrastructure, not apps.

We build hardware that sits on real sites. That forces a level of operational discipline a pure-software company doesn't need.

— 03

A rate that doesn't move.

Your per-kWh rate is fixed for the term — it doesn't drift up or down with the wholesale market the way a standard retail contract does. We carry that risk; you get a flat line on your bill.

Get in touch

Want to work with us
— or for us?

Talk to us See open roles